Actions

Materials Preparation Store Example 1

From DT Online

Revision as of 23:44, 14 February 2017 by DT Online (talk | contribs) (Created article)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

DT workshop technician based here.

  • Try to place in centre of workshop area, on ground floor and with outside access for deliveries
  • Try to ensure easy access to workshops - especially Construction and Engineering - ie Vocational areas
  • Try to position CAM area adjacent to workshop technician base and any central DT project area


MaterialsPrep1.png